Figure 1: At chainage 48.20 m of the tunnel section, significant overbreak of about 4-5m is observed on the left wall extending up to the crown. Date:2025/04/21Figure 2: At chainage 48.20 m of the tunnel, a significant overbreak occurred from the left wall to the crown due to weak and loose ground with seepage. Date:2025/04/ 22